|
12 years for a new life,
it implies that thrive
into the teens. 12
years, the Suzhou
Industrial Park, through
the means established,
the initial development
stage. entered a new era
of prosperity. When we
use "for 12 years with
an average annual growth
rate of major economic
indicators 40%%" data to
show the results of the
park. We found that
economic development is
only a small aspect of
the park lively faces.
From the first
enterprises to set up
the first residential
occupancy, from Lakeside
Avenue to the completion
of the building of Lake
merchants. From the
birth of the
International Tech Park,
the emergence of many
vector technology, as a
Metro, the park's
harvest is multifaceted.
[A moment -- in 1994,
laid the first piles
shots : May 12, 1994.
Jinji Lake in the
Millennium sleeping
machine rumbles China
and Singapore -- the
largest cooperation
project between the two
governments cooperation
in the Suzhou Industrial
Park to lay a new first
piles. Prior to the
February 26, the two
governments signed "on
the joint development of
the Suzhou Industrial
Park agreement".
Thereafter, the Joint
Coordination Council of
the Suzhou Industrial
Park, the first held in
Singapore; China and
Singapore held a
bilateral meeting
between the two; New
Suzhou Industrial Park
Development Company, and
South Korea's Samsung.
BD United States, Japan
Pokka 14 foreign-funded
enterprises have entered
the zone signed a
development agreement;
Park plans to build
economic and trade
delegation to Singapore
for training; Detailed
planning of the
development zones in the
first phase of the park
was adopted. As the
first year of
development and
construction in the park
in 1994, it is so
forever stay in the
park's memory. Comments
: When placed in the
park in 1994 by the
12-year development
history into
consideration, we found
that Today's success is
closely related to this
is the time when the
decision. Without
planning and
development. "Planning
in advance" is a major
feature of the park was
commendable. In those
years, the concept of
focusing on the 50-year
development plan began
brewing. February, the
first phase of the park
planning development
zones approved by the
experts. Time, the park
"six links to the edge"
infrastructure projects
and the construction of
ramps into the park's
main road Su works in
full swing Although the
"six links to the edge,"
later to a "1992 links
peace" But the
importance of building
infrastructure for the
park are evident. Pay
attention to learning
from Singapore's
experience in the park
and sent the first group
is planning to build a
new training and
training. Then in
November, the first
phase of park
development zones
detailed planning was
adopted. Until that
time, the park's only
the first piece of land
transfer. Up to now, the
park has completed more
than 300 professional
planners. New
cooperation with the
surrounding townships
covering 288 square
kilometers and has plans
to invest up to more
than 200 million yuan.
It is the entire
coverage plan, the park
makes a clear functional
positioning, direction,
and urban spatial
distribution on the
basis of morphology,
promoting the orderly
development and
construction; the sale
of the land to create a
high-profit, low-risk
investments to create a
predictable environment,
protection of the
fundamental interests of
the long-term investors.
[2] 1998 moment, a
camera built homes Area
: February 5, 1998, the
park completed the first
phase of a home garden
Metro Area. In many
people's memory, Metro
settled in the Garden
"Metro" and "Garden"
will bring a lot of new
concepts. Long
corridors, the green
40%% distribution,
professional property
management, or even
later denied the lights
will be shut down
automatically. Many
people have a lot of
emotion Metro Gardens
"Singapore flavor." Now,
the garden gradually
Metro is not "new", but
it has important
symbolic significance.
In May that year the
first tenants move into
memory, to create a
district also called
Chris Patten Road
entrance of the road,
lights Takano Toshiyuki,
Opposite to the district
with a large watermelon.
With Chris Patten Road
as a modern road,
Watermelon Lane with the
"long" out of the city
garden Watching at the
gate of the park on this
park to grow. Comments :
Habitat of the park from
the very notion of
heaven is not something
that arose suddenly.
Built in the early years
of development and
construction of the
Metro Garden, not only
of the park early on the
home builders. ATTRACT
PHOENIX has not only to
attract talent
development in the new
period, the significance
of the park. It also
shows the park is not
just an industrial zone,
its objective is a fully
functional new city.
Now, the environment,
the beautiful scenery
flats in the mid -
to-high-end industrial
zone, the surrounding
business district. He
thoroughly understands
that the park will not
only allow people to go
to work, shopping,
leisure and
entertainment
convenient. Suzhou is to
attract many veteran
home buyers to purchase
the park has become a
habit. Suzhou park into
luxury flats for sale is
for the representatives.
Statistics show from the
relevant departments of
the park, the park's
resident population of
nearly 27 million people
in the region. transient
population over 200,000,
a new cooperation of the
working population has
topped 120,000 people
living in a population
of nearly 100,000
people. of which more
than 8,000 were
foreigners. [3] 1999
instant, the camera
initially embryonic
northern industrial belt
: 1999. Hong Su road
along the northern
industrial park with
embryonic there. In
planning the layout of
the first phase of the
park, north of the
industrial zone in
southern industrial zone
and distribution of the
two industrial projects,
and the distribution of
the northern industrial
belt along the main road
start Su Hong, many of
the projects focus on
such distribution in the
Hong Su both sides of
the road. From the
initial Andrews,
Emerson, Philips, Nokia
later, National
Semiconductor, Maxtor,
Amahiro. These
large-scale investment,
new technology forces, a
representative of a
certain enterprises are
located in the northern
industrial belt choice.
To guide the development
of the park is based on
high-tech, modern
industry as the
mainstay, and Hong Su
Road industrial corridor
like a miniature, Park
Heights, a highly
compressed image as a
high-tech industries. At
present, Hong Su Road
corridor will bring
together more than 100
industrial enterprises.
At the park enterprises
have invested 100
million U.S. dollars in
the super-half in here.
Comments : For a
high-tech pioneer of
modern industry as the
main park, Hong Su is a
wonderful way of nodes
in the world transfer
market opportunities for
the IT industry to find
development
opportunities. Most
representative of the IT
industry in this
category would be found
in the typical
enterprise. The American
semiconductor products
from National
Semiconductor, Philips
Semiconductors
semiconductor production
equipment to vacuum out
the fat love, 100 Teng-technology
industries engaged in
the high PCB Germany,
Rogers, electrification,
the Friends reached
processing computer
products, Maxtor,
Amahiro. Andrew
processing and related
communication products,
Nokia, build, it would
be very easy for them to
set out on a string. Su
Hong expanded to the
whole road from the
northern industrial
belt, from the northern
industrial belt to the
entire park. We can
touch the height of the
industrial park.
According to statistics,
at present, the park has
approved 2,470 foreign
investment projects,
realized 25.76 billion
U.S. dollars of
contractual foreign
capital. registered
18.78 billion U.S.
dollars of foreign
capital, foreign capital
actually utilized 10.96
billion U.S. dollars,
from 0 to 10 billion.
remarkable economic
achievements. Chinese
enterprises have settled
down in the park, 100
break above the
provincial level
high-tech enterprises,
especially in the IC.
TFT-LCD, auto and
aviation parts. Park has
a competitive edge in
the international
high-tech industries.
[4] in 2003 moment, the
camera : Jinji Lake ′ s
building of the bridge
in May 2003. Jinji Lake
′ s construction of the
bridge into the climax,
which is a major
east-west road
connecting the park
modern bridge total
investment of 130
million yuan project.
The bridge site, while
30 rigs roar Large
operation, a team from
piling Six every day,
Speed piling 8-10 root
of the entire project is
a 448-piling occur. Less
than a year later, more
than 2 km in length
Jinji Lake ′ s official
opening of the bridge,
was opened to traffic,
People riding a bike can
Tuk Huxi off from the
East Lake store, not
more than 10 minutes.
Huxi put a bridge, to
link together East Lake,
East Lake suddenly
narrowed wonderful.
Comments : Just Suzhou
gardens represent the
image, Jinji Lake ′ s
has unwittingly become a
representative of the
park's image. Jinji Lake
′ s construction of the
bridge to the wider
understanding of the
opportunities for East
Lake, although this had
loneliness. There are
even more difficult to
reach the land once, in
March 2001 it quietly
taken the building. In
addition to industrial
projects and gradually
eastward, a large-scale
urbanization and the
construction of the East
Lake is a matter between
2002-2005. Among them,
the year 2003, while the
construction of the
bridge and there
Atmosphere Jinji Lake ′
s bridge Sheng WeiTing
Bridge and the Bridge. A
total investment of more
than 400 million yuan in
the four East Lake
Bridge opened to traffic
to ensure the smooth
flow of traffic. 2004
and 2005 two years, the
East Lake into the
ground 53 practical
projects, the volume of
investment reached
15.328 billion yuan,
accounting for 70% of
the total investment for
the project of the park
solid ground. Planning
and construction
departments told
reporters that East
Lake's infrastructure is
of a high standard. The
development cost of
nearly 600 million yuan
per kilometer. High
standards for the
construction of
infrastructure
facilities to create
favorable conditions for
investment in East Lake.
[5] instantaneous 2004,
the 10th anniversary of
the establishment of the
park scenes : June 10,
2004. Park to mark the
10th anniversary of the
founding of Jinji Lake
held in the beautiful
landscape. Many
participate in the grand
celebrations for the
park from scratch, from
the foundation to the
development and
prosperity of the people
of emotions. Ten years
ago, Suzhou Jinji Lake
for many locals, this is
a rare set foot in the
wilderness and demanding
in 10 years, in the many
factories and houses,
and how many people put
up security here, and
start to focus on here.
Ideas have become
distant Huxi have, the
pace of development has
begun to develop into
more distant East Lake.
At the celebrations
organized by local, as
famous for the Wu Kwong
color can Looking Huxi
the unusual appearance
today, More importantly,
a beautiful bridge
across the Jinji Lake ′
s Petersen, clear touch
of the East Lake is
closely following the
development of rhythm.
That a China-Singapore
Joint Steering Council
of the park's
development goals in the
new decade : strive to
reuse a period of 10
years. to a high
standard of development
of the park, basically
built an international,
modern, the new Garden
City. Comments : promote
the development of the
park is a coordinated
process of rapid
economic development,
build a rational
industrial structure,
internal co-ordination
and enliven the outside
world, Manpower lead
with a strong priority
areas such as enriching
always haunting. With a
new industrial system,
innovation system and
urban social security
system. Habitat and the
most suitable form of
the city's comprehensive
business environment,
initially the urban
modernization is a new
10-year development at
the park. In taking
stock of the
achievements of 10
years, more and more
people in the park plan
for the future. That
year, a new 10-year high
platform to take off
Park in the next two
years, it will invest 40
billion yuan in fixed
assets. more than four
million square meters of
new residential real
estate, plant two
million square meters of
new standards.
additional six million
square meters of green
space, 700,000 square
kilometers complete
infrastructure
development, link up all
the infrastructure to
achieve 260 square
kilometers. Strive to
2005, when more than 50
practical projects in
construction,
landscaping works, the
basic image projects
completed East Lake then
the delegation plans to
build two 20,000, the
total population size of
more than 250,000. The
urbanization rate from
the current 75% to over
90%. 2010, the
population reached
500,000. and the
industrial system with a
new, innovative and city
security system. Habitat
and the most suitable
form of the city's
comprehensive business
environment, initially
the urban modernization.
Among them, in East
Lake, the facilities
will be built
administrative center,
exhibition center,
science and art and
cultural center; leisure
areas of Jinji Lake ′ s
belt, white Tong Park;
Commercial facilities
are neighborhood
centers, and cultural
corridor Commercial
Pedestrian Street,
shopping center joint
HSBC, Jinji Lake ′ s
Hotel; East Lake has
primary education
facilities, East Lake
schools Independence
villa Lake Area of
Higher Education; a
foreign medical Kowloon
Hospital; planning light
rail transport
facilities, 78 roads At
least six more bus
lines, functions fairly
complete. Today, most of
these projects have been
completed, the East Lake
Park rewrite speed is
the speed.
[Instantaneous -- 2006,
opening a new era of
East Lake Scene :
February 6, 2006 Park
CMC New Year is the
first day of work.
10:00, in a solemn
national anthem, the
five-star red flag at
the new administrative
center in East Lake Park
Place, gradually rising.
New Year's flag-raising
ceremony at the park not
only opened a new scene,
also in the park
commemorating this day
of special significance
in the development
history : This day is a
day of full operation of
the new administrative
center, but also
indicates that the park
is entering a new
development era of East
Lake. Comments :
Although the
administrative center of
the park just east of
the new 5 km, has
released the "new era of
East Lake," the arrival
of a strong signal.
Based administrative
center to look around
and find that they have
completed the
development and
construction of
residential and
commercial facilities
Cultural facilities have
a considerable size. In
some sense, to the
administrative center of
East Lake City has
formed a certain
pattern. East Lake is
not the focus of a new
era in the development
of park space on the
east, along with the
park upgrading of the
manufacturing industry.
doubled and technology
services across the
"three" in the process
of establishing a new
era in a new development
direction for the park.
Of these, the industrial
upgrading, industrial
restructuring, the first
half of this year, the
new industrial park on
320. 746 service
projects, new service
projects and the number
of projects 63%%,
secondary and tertiary
industries in the
progressive realization
of interactive
optimization; capital
projects, research
projects, funded 500
projects become key
election Optional
business, especially
with the strong Health
Pharm - Ingersoll-Rand
and other domestic
revenue-based, high
value-added items to
enter the region further
optimize the industrial
structure. Focusing on
building a
resource-saving,
environment-friendly
park. Park increasing
"national eco-industrial
demonstration park"
build, million over the
end of last year,
industrial output fell
8%% energy. cut down the
total area of land sold
in the circumstances to
reduce 30%% attract
investment, to further
enhance the level of
intensive development.
Doubled and the service
industry, science and
technology parks across
the city for promoting
more comprehensive and
increasing scientific
and technological
innovation capability.
|